QVISE engaged with DJHC and Aeroton, signed the contract for Integrated Logistics Support (IPS) development in April 2018, and commenced the project. This Project was completed in July 2020. The IPS scope was from Design Phase through to Construction Phase. The scope of the contract included

Ship Fit Definition (SFD) Preparation

Configuration Management

Logistic Support Analysis (LSA / PSA)

Interactive Electronic Technical Manuals (IETM)

Maintenance Management System (MMS)

Supply Support